Model NO.: PCH51
HS Code: 85159000
PCH51 Plasma Spare Parts Cutting Nozzle Electrode For Plasma Cutting Torch
Item | Plasma Cosumables Compatible For Thermal Dynamics PCH-51 |
9-5633 | Electrode |
9-5720 | Electrode-4Xi Only |
9-5630 | Shield Cup-Ceramic |
8-2159 | Shield Cup-Phenolic |
8-5526 | Shield Cup-Crown Ceramic |
9-5779 | Shield Cup-Crown Copper |
9-5718 | Tip - 10-40 amp |
9-5631 | Tip - 10-60 amp |
8-3321 | Tip - 65 amp |
9-5724 | Tip - Gouging |
Packing | Neutral Packing |
Certification | ISO9001, CCC, CE, ROHS, TUV |
Changzhou Huarui Welding & Cutting Co., LTD
Since the establishment in 1985, we have become one of the biggest manufacturers of welding
and cutting equipment and accessories in China by modern manufacturing equipment and
special technology.Â
We are specialized in manufacturing MIG, TIG, PLASMA, Welding Torches and Spare parts.
With Euro connector, Lincoln connector , Miller connector and Tweco connector, we can fit
different kinds of foreign equipments.
1.MIG Welding Torch
Binzel, Bernard, Tweco, Esab, Lincoln/Tregaskiss, Panasonic/OTC, MAXI, Kemppi, Fronius,
Mechafin.
2.TIG Welding Torch
WP-24, WP-9,WP-17, WP-26, WP-20, WP-18, etc.
3.Plasma Cutting Torch
Trafimet, Cebora, Panasonic/Esab
FAQ
Q1: Can I get a samples to check the quality?
A:Sure,we can supply samples. For regular goods, the sample cost is different from the amount
you want. For our new products, there's a MOQ of the samples.
Q2: Can I put my logo on the boxes/cartons?
A: Yes, this can be made according to your requirements, but you should send us the trademark
authorization letter.
Q3: How can you guarantee your products quality ?
A: Huarui's each torch must pass the following tests before packing: Insulation resistance test,
High voltage test, Air/Water flow test, Air/Water seal test.
If there are defective items, we usually credit to our customer or replace in the next shipment.
Q4: What's the order procedure?
A: Firstly, we discuss the details together by e-mail or TM. Then we issue you a PI for your
confirmation or Trade Assurance Order Payment Link. You will be requested to do the pre-paid
full payment before we go into the production. After we get the payment, we start to process the
order. It usually takes 5-15days if we don't have the items in stock.
Â
Digital Display Hydraulic Compression Testing Machine
Concrete Compression Testing Machine,Construction Lab Equipment,Brick Compression Testing Machine,Cement Compression Testing Machine
Jinan Chenda Testing Machine Manufacturing Co., Ltd. , https://www.jncdtester.com