Straw power generation capacity will reach 1 million kilowatts

The Hebei District Office of Guoneng Bio-Power Co., Ltd. and the New Energy Engineering Department of Hebei Electric Power Survey and Design Institute were unveiled. At the opening ceremony, the reporter learned that the Weixian and Cheng'an straw power plant projects invested by Guoneng Bio-Power Co., Ltd. are under intense construction. It is planned to start production at the end of this year. The Jinzhou straw power plant invested by the provincial construction investment is also currently During the rapid advancement, during the “Eleventh Five-Year Plan” period, the biomass power generation capacity of our province will reach 1 million kilowatts. At present, Guoneng has started construction of 14 biomass power generation projects across the country, including two in our province.

Gold Electrowinning Equipment

JHP series gold-loaded carbon medium temperature non-cyanide desorption and same temperature electrolysis equipment was developed by Changchun Gold Research Institute Co., Ltd. in 1998 and entered the market. It has been used in more than 800 enterprises at home and abroad. This series of equipment is oriented to the gold-loaded carbon in the gold cyanide carbon slurry process for gold desorption and electrolysis, and the gold adsorbed on the gold-loaded carbon is produced in the form of high-grade gold mud. After decades of practical application and continuous optimization and improvement in enterprises, this series of equipment has developed to the fifth generation.

Gold Electrowinning Equipment,Mining Equipment,Gold Process Equipment,Gold Processing Equipment

Changchun Gold Research Institute Co.LTD , https://www.changchunmachine.com