Model NO.: RMBM16-01601213
Runner: Cold Runner
Design Software: UG
Installation: Semi Fixed
Standard: HASCO
Customized: Customized
Name: Plastic Hanger Mould
Cav Nos: Multi Cavity
Cav&Core Material: P20 / 718
Base Material: 45#
Mould Life: 800,000-1,000,000 Shots
Runner System: Cold Runner Side Gate
Cooling System: Warer Cooling
3D Design: Solidworks
Sample Time: 30-45 Days
Special Service: Weekly Report with Machining Photos
Trademark: REMO
Transport Package: Wooden Case
Specification: SGS certified
Origin: Taizhou China
HS Code: 8410719090
Plastic cloth-hanger mouldAs a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.





Name Description
Products' infomation we need to make quotation Clear Pics/material/size/weight/wall thickness/targetting quantity and etc.
Mould Material 45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKD61 etc
Mould Base LKM, HASCO ect.
Cavity Single/multi
Runner Hot/cold
Mould Design 3D/2D Drawing
Design Days 3 days
Design Software UG, PROE, CAD, CAE, CAM, CAXA ect
Plastic Material PP, PC, PS, PE, PU, PVC, ABS, PMMA ect
Mould Life 300, 000-3, 000, 000 shots
Injection System Pin-point-gate
Polish System Mirror Polish
Payment 40% of Deposit by T/T, 60% of Balance by T/T
Delivery Time 15-60days
Specification Depends on customers requirements
Business Step | |||||||
1. R& D | We support customer R& D. Make the files or improve the design if you needed | ||||||
↓ ↓ ↓ | |||||||
2. Quotation Making | Mould Quotation will be finished in 1 day according to information we get | ||||||
↓ ↓ ↓ | |||||||
3. Negotiation | The quality, price, material, delivery time. payment item. ect | ||||||
↓ ↓ ↓ | |||||||
4. Mould Design | 3-5 days for mould and product 3D/2D drawing design | ||||||
↓ ↓ ↓ | |||||||
5. Mould | According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days | ||||||
↓ ↓ ↓ | |||||||
6. Mould Testing | When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. | ||||||
↓ ↓ ↓ | |||||||
7. Sample shoot | If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory | ||||||
 ↓ ↓ ↓  | |||||||
8. Delivery | Delivery goods by sea or by air, according customers requirement |
PVC CPE EVA Plastic Zipper Packaging Bag
Plastic Zipper Packaging Bag,Pvc Zipper Packaging Bag,Cpe Zipper Packaging Bag,Eva Zipper Packaging Bag
Dongguan Pasike Packaging Co., Ltd. , https://www.nbdgpasike.com