Beipiao City Yannan Haoting Residential Area 1# Building Project

Project Name: 1# Building Project, Residential Area, Yannan Heights, Beipiao City

Progress phase: Construction preparation Construction period: May 2011 - August 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc.

Project Profile: The project is located on the north side of the west section of Shifu Street in Beipiao City, with a construction area of ​​312,507,700 square meters. Structure: frame, number of layers: basement level, 17 floors above ground, 9 meters deep, structure: frame shear wall structure span, number of layers: 18.
The total investment of the project is RMB 32 million.

Construction Unit: Beipiaoda Real Estate Development Co., Ltd. Postal address: West Section of Zhenxing Street, Beipiao City Zip Code: 122100
Contact: Yang Yulan Telephone

Related Developments: Tower Crane Infrastructure Project

Vertical Winding Machine

Functional features:

The machine is made up of a stepless speed variable winding chuck and a hydraulic lifting platform. No any pit should be construced in foundation and the chuck need not lift. According to customer requirements can be arranged into a pie wire, tensioning unit, accessories and operators could load on the platform, which enables a constant operating altitude. This machine is suitable for regions wit high level of underground water or workshop unsuitable for pit.

Application:

Over floor vertical winding machine is applied to coil winding for large and middle capacity transformers.

Wire Winding Machine,Vertical Winding Machine,Wire Cutting Machine,Automatic Vertical Winding Machine

JINAN EURO-ASIA MACHINERY CO., LTD , https://www.euroasiamachine.com