Model NO.: QY
Power: Electric
The process of a dyno test on a Liebherr engine
…
Source and properties of wastewater from tailings reservoir of sulfide mine
A part of the beneficiation process wastewater in the sulfide ore dressing production is clarified and used for beneficiation production. A part of the remaining ore slurry i…
The process of a dyno test on a Liebherr engine
…
- Model NO.: YS1207 …
In the electrification process, the method of charging the ore particles is usually triboelectric charging, inductive charging, contact charging, charging in a corona electric field, and charging in a composite electric field.
…
Solar solar-powered insecticidal lamp is powered by solar energy and is a new type of agricultural pest control equipment. It has the advantages of ecological environment protection, stable performance, long service life, high trapping efficiency, variety of species, etc. It is curre…
The process of a dyno test on a Liebherr engine
…
The process of a dyno test on a Liebherr engine
…
The process of a dyno test on a Liebherr engine
…
The process of a dyno test on a Liebherr engine
…
Abstract: Water ring heat pump air conditioning system is a kind of application of small water / air heat pump unit. That is, the water loop connects the small units in parallel to form a heat pump cooling and heating air-conditioning system which takes the waste heat inside the…